Big chunks of the new carrier set sail!

The Crewroom for non-FS related stuff, fun and general chat.

Moderators: Guru's, The Ministry

User avatar
John
Concorde
Concorde
Posts: 1751
Joined: 30 Jul 2004, 14:13
Location: Emsworth, Hampshire
Contact:

Big chunks of the new carrier set sail!

Post by John »

http://www.royalnavy.mod.uk/news-and-ev ... geNav/6568

They're really getting on with it!

Kind regards

John
never give up, never surrender

Image

User avatar
DaveB
The Ministry
Posts: 30457
Joined: 17 Jun 2004, 20:46
Location: Pelsall, West Mids, UK
Contact:

Re: Big chunks of the new carrier set sail!

Post by DaveB »

I hope they build a little more than that :lol:

Seriously.. I love the way they build ships in different dockyards these days then assemble all the bits. Can this really be more cost effective than giving the lot to one shipyard though *-) I guess it's easier to keep lots of small workforces employed doing small jobs and keeps parts of the country in work where there might be none ;) Still.. it does seem an odd way to build a ship! :)

ATB

DaveB B)smk
ImageImage
Old sailors never die.. they just smell that way!

User avatar
DelP
The Gurus
Posts: 2243
Joined: 16 Aug 2004, 21:40
Location: Under EGCC 23R approach....

Re: Big chunks of the new carrier set sail!

Post by DelP »

Many years ago when I was at college in Sunderland, after the pubs kicked out, we'd go down to the bridge across the Wear and look down on the shipyards, the flicker of welding torches and and gas axes.....there was a big foundry, old style building with windows all along the side...you could watch the crucible trundle along on the gantry for the midnight pour, a mobile volcano....

All long gone :(

Derek
'My Auntie Mabel told me I'd make a great soldier, though I don't know how 30 years working in a biscuit factory had qualified her to make that judgement.....' Eddie Nugent

Airborne Signals

User avatar
Garry Russell
The Ministry
Posts: 27180
Joined: 29 Jan 2005, 00:53
Location: On the other side of the wall

Re: Big chunks of the new carrier set sail!

Post by Garry Russell »

John wrote: They're really getting on with it!
Don't forget John.....they have to wait unitil enough is built to be much, much cheaper to carry on...... before they cancel it :worried:
Garry

Image

"In the world of virtual reality things are not always what they seem."

User avatar
jonesey2k
Vintage Pair
Vintage Pair
Posts: 2613
Joined: 13 Aug 2004, 13:59
Location: Liverpool
Contact:

Re: Big chunks of the new carrier set sail!

Post by jonesey2k »

I just hope they bin the F35 and get some F18's to chuck off them. Be far cheaper so we can have two carriers instead just one and a bigger HMS Ocean...
Error 482: Somebody shot the server with a 12 gauge.

User avatar
John
Concorde
Concorde
Posts: 1751
Joined: 30 Jul 2004, 14:13
Location: Emsworth, Hampshire
Contact:

Re: Big chunks of the new carrier set sail!

Post by John »

Garry Russell wrote:
John wrote: They're really getting on with it!
Don't forget John.....they have to wait unitil enough is built to be much, much cheaper to carry on...... before they cancel it :worried:
I'm pretty confident that the carriers will be ok, not so sure about the F35s though, after all why 'future proof' them with catapult channels already designed in if we're 100% about the F35?

Kind regards

John
never give up, never surrender

Image

User avatar
basys
VC10
VC10
Posts: 524
Joined: 06 Apr 2006, 12:28
Location: EGNL, Barrow-in-Furness, Cumbria, UK
Contact:

Re: Big chunks of the new carrier set sail!

Post by basys »

Hi Folks
DaveB wrote:I love the way they build ships in different dockyards these days then assemble all the bits.
Can this really be more cost effective than giving the lot to one shipyard though *-)
Yes its very much cheaper.

Lots of firms compete financially for small work packages.
Each has a strict contractual liability.

They only need attract a small number of personnel to supplement their core workforce.
Generally drawn from within their own locale,
without a major influx of contractors, which adds accomodation costs.
DaveB wrote:I guess it's easier to keep lots of small workforces employed.
It's not so much keeping small workforces employed.

Its more about
not putting all your eggs in one basket,
then potentially being held to ransom
by either the company, through -
- Project design delays, construction personnel with no tasks.
- Insufficient local personnel, requires external contractors.
- Inability to attract personnel, unattractive rates.
all of which increase the wage bill.
or the workforce itself - through industrial action.

Contracts have fixed deadlines,
after which penalties are incurred.

As deadlines draw closer,
the more work outstanding,
the more personnel you need to throw at the contract.

After the LPD debacle,
requiring up to 600 contractors on day rates for ~5 months,
and the inability to attract personnel during Astute build,
BAE Systems Barrow pulled out of the construction phase.


Garry Russell wrote:they have to wait unitil enough is built
to be much, much cheaper to carry on......
before they cancel it :worried:
Gary -
AIUI
The cheaper to cancel gate was passed in late 2007.
i.e. Before the contracts to build were signed in May 2008.
Due to design, contractual liability, and long lead component costs.



To put some perspective on this -
For both vessels
the total cost of steelwork materials is £65M
which is only 0.017% of the project's cost.



HTH
ATB
Paul
Image
I've never felt so frustrated....... died so frequently/spectacularly/or needlessly....... yet had so much fun, in a long time.
Flight's Landing Challenges - Earn your wings !

User avatar
John
Concorde
Concorde
Posts: 1751
Joined: 30 Jul 2004, 14:13
Location: Emsworth, Hampshire
Contact:

Re: Big chunks of the new carrier set sail!

Post by John »

A great insight, thanks for that

John
never give up, never surrender

Image

sketchy74
Vulcan
Vulcan
Posts: 428
Joined: 12 Jan 2006, 11:27
Location: Los Angeles, California, But an ExPat Brit from Cornwall

Re: Big chunks of the new carrier set sail!

Post by sketchy74 »

Great to see these being started regardless of the logistics, complexity or political reasons for them being built all over the country.

Its amazing to see how the American's build their Nimitz class carriers these days, sections of them are built on the side of the dockyard complete with plumbing, wiring and IT systems and they just lower them on to the keel one by one, including the Island, I guess with the best part of Ten Nimitz carriers they have building them down to a fine art now! lol

Anyhow, Rule Britannia! Sorry had to type that :) Looking forward to seeing these ships afloat.

User avatar
basys
VC10
VC10
Posts: 524
Joined: 06 Apr 2006, 12:28
Location: EGNL, Barrow-in-Furness, Cumbria, UK
Contact:

Re: Big chunks of the new carrier set sail!

Post by basys »

Hi Folks
sketchy74 wrote:Its amazing to see how the American's build their Nimitz class carriers these days,
sections of them are built on the side of the dockyard complete with plumbing, wiring and IT systems
and they just lower them on to the keel one by one, including the Island,
sketchy -
Yep,
Modularized-Build and Pre-Outfit has been the norm in the UK since mid 80's.

Empty shells to berth, then out-fitting, are an extreme rarity now,
and only if design delays occur,
when space is required in Assembly-Sheds for other steelwork.

Sometimes for access purposes,
units are built and outfitted, upside-down or end-on.

For submarines,
many modules are fully completed, commissioned, and operational,
- Main-Machinery - Run for almost a year
- Command-Deck - Used by navy for training.
before even being slid into the hull.

HTH
ATB
Paul
Image
I've never felt so frustrated....... died so frequently/spectacularly/or needlessly....... yet had so much fun, in a long time.
Flight's Landing Challenges - Earn your wings !

Post Reply